Louisiana Power. Explained.

Energy Explained

Louisiana Power,
Explained.

Louisiana's energy future is being decided right now, in the wires that carry it and at the ballot box that decides who regulates it. Your power. Your say.

Energy 101

Power has a path. Production + Transmission

Electricity does not travel straight from a power plant to a wall outlet. It moves through a connected system that generates power, carries it long distances, lowers the voltage, and delivers it locally. Select each stage to follow the journey.

How electricity reaches your home or business
Stage 1 of 5

Power is generated.

A power plant converts an energy source into electricity. The cost of that fuel is one of the first ingredients in the price customers ultimately pay.

Stage 2 of 5

Voltage goes up. Power travels out.

High-voltage transmission lines, including the large towers seen along highways, carry electricity efficiently across long distances.

Stage 3 of 5

A substation redirects the flow.

Substations lower the voltage from the transmission system and direct electricity toward the communities and local areas that need it.

Stage 4 of 5

Distribution lines take over.

Lower-voltage lines, often carried by the poles along neighborhood streets, move electricity through the final local stretch.

Stage 5 of 5

Electricity arrives where it is used.

The system delivers power to homes, schools, hospitals, stores, and industrial facilities. Every stage has to work for service to remain reliable.

Three forces put pressure on the system.

Open each card to see why the grid, and the cost of using it, keeps changing.

Fuel costsOpen to learn more

Electricity has to be generated before it can be delivered. The price and availability of the fuel used to produce power can move over time, influencing the cost of electricity before it ever enters the grid.

Infrastructure investmentOpen to learn more

The grid has to be built, maintained, repaired, and upgraded. Investment keeps the system reliable and helps it withstand stress, whether that pressure comes from age, severe weather, or new demand.

Rising demandOpen to learn more

Population growth, industrial expansion, data centers, and electrification are all pulling more power. Louisiana already has the nation's highest residential electricity use per person, while industrial customers account for more than 40% of electricity sold in the state.

The grid at a glance
11,000+ miles of transmission line Entergy system figure
1,300+ substations Entergy system figure
70% of U.S. transmission lines are more than 25 years old National DOE figure
100+ mi. of new or upgraded transmission lines SWEPCO Louisiana figure

Growth + Affordability

Louisiana is getting this right. Let's keep it that way.

Historic investment is coming to Louisiana, including data centers, manufacturing, LNG, and more. Smart policy can ensure that the companies creating new demand pay for the infrastructure they require, not families and small businesses already on the system.

The basic principle

A new large-load project adds demand
The grid needs new infrastructure
The cost follows the new demand
Existing ratepayers are protected

Three safeguards keep growth from becoming someone else's bill.

Select each principle to see how it protects ratepayers while allowing Louisiana's economy to grow.

Three pro-ratepayer policy safeguards
Safeguard 01

The cost follows the cause.

A cost-causation framework ensures that new large-load customers pay for the grid upgrades their projects require, instead of shifting those costs onto existing households and businesses.

New demand pays its fair share
Safeguard 02

Necessary does not mean unlimited.

A lowest reasonable cost standard requires utilities and regulators to meet new needs without treating every expensive option as inevitable. It prevents unnecessary costs and keeps ratepayers protected.

Investment must be justified
Safeguard 03

Big decisions belong in the open.

A public technical conference and docket keep the process open, transparent, and informed while new large-load rules are developed, tested, and refined.

Transparency strengthens the rules

Energy optionality Q+A

More ways to build power. Fewer risks for ratepayers.

Louisiana needs more electricity. The question is how to add new generation without automatically shifting the cost and risk to households and small businesses. These answers explain the emerging alternatives in plain language.

The optionality spectrum
Utility Public grid
PUEN Private + connected
CRE Private + islanded
01 Why is “electricity generation optionality” suddenly such a big topic?

Electricity demand is growing faster than it has in decades, driven by data centers, AI, manufacturing, and industrial growth. Traditionally, states have met new demand by allowing a monopoly utility to build power plants and recover the cost through customer bills. That is no longer the only model available.

A growing number of states are considering alternatives that let large energy users build or buy their own power instead of automatically expanding the regulated utility system. The basic idea is that more ways to build generation can mean more competition and more capacity. Done well, it can also reduce cost pressure on customers who did not create the new demand.

02 What is a Private Use Electrical Network, or PUEN?

A PUEN is generation and storage built to serve a specific large customer, such as a data center or manufacturing plant. It is located on the customer's property, or on commonly controlled property, and delivers electricity through privately owned facilities rather than relying entirely on the public grid.

Because the electricity is built for that customer rather than resold to the general public, the arrangement may be treated differently from ordinary retail electric service. The customer and developer bear the cost and risk of building it, so everyday ratepayers are not automatically responsible for the investment.

03 What is Consumer-Regulated Electricity, or CRE?

CRE is a related but distinct model for private, physically islanded electric arrangements that serve sophisticated customers through voluntary contracts. The system does not connect to the public grid and does not operate under traditional utility-style economic regulation.

Think of CRE as the fully off-grid end of the optionality spectrum. With no connection to the public system, there is no shared grid infrastructure cost or operating risk to spread across other customers. Learn more about the CRE framework.

04 What is the practical difference between PUEN and CRE?

The simplest explanation is: PUEN is private power with a grid connection. CRE is private power without one.

A PUEN may maintain a limited connection to the public grid for backup power, standby service, or the export of surplus electricity. That creates a defined relationship with the local utility. CRE, as conceived, has no grid connection at all. Both approaches allow large users to meet their own needs through private arrangements so new demand does not automatically become a new cost for households and small businesses.

05 Are other states doing this, or is it still just a theory?

It is real and moving quickly. New Hampshire enacted a law in 2025 authorizing qualifying off-grid electricity providers. Texas took a different approach, creating new curtailment and demand-management requirements for large loads such as data centers. Lawmakers in Illinois, Maryland, and Colorado have also considered related off-grid or consumer-regulated electricity proposals.

Louisiana is evaluating PUENs through Louisiana Public Service Commission Docket No. R-37905. Senate Bill 490 proposed a statutory PUEN framework during the 2026 legislative session but did not receive final passage. This is a national policy trend, not a one-state experiment.

06 Why should someone who is not a large industrial customer care?

Under the traditional model, the cost of serving a new large customer can be spread across the broader ratepayer base, including households and small businesses that receive none of the direct economic benefit. When a large user builds or buys its own power through a PUEN, CRE, or similar arrangement, more of that investment and risk stays with the customer creating the demand.

Every megawatt supplied privately is also a megawatt the utility may not need to build new generation or transmission to serve. That can reduce upward pressure on other customers' rates while preserving scarce grid capacity and supporting reliability.

07 Does this let large companies avoid paying their fair share of the grid?

This is the central design question, and it is a legitimate one. Strong policies follow a beneficiary-pays principle: a large user that wants backup power, standby service, or the ability to export electricity onto the public grid should pay the full cost of that service rather than shifting it to other ratepayers.

Done correctly, optionality does not allow anyone to avoid paying for what they use. It prevents ordinary customers from being required to pay for infrastructure they do not use.

08 What role do state law and the Public Service Commission play?

A central one. PUENs, CRE, and similar models do not happen automatically. State law and regulation must define what qualifies as a private network, what obligations it has to the public grid, how backup and standby power are priced, and what happens if a private arrangement fails.

Details such as customer-size requirements, export limits, and decision timelines determine whether these policies produce more capacity and lower cost pressure or simply create new loopholes. That is why transparent rulemaking and public participation matter.

09 Is this the same as deregulating the electric utility?

No. These models do not dismantle the existing regulated utility system. They create a narrow, clearly defined parallel pathway for qualifying customers that want to build and manage their own power. The traditional utility continues serving everyone else under its existing regulatory framework.

It is less like removing the existing road and more like adding a carefully designed new lane beside it.

10 What should people watch for when evaluating a state's policy?

Look for four things: Does the private customer pay the real cost of any connection to the public grid? Is there a clear and reasonably fast process for developers to receive a decision? Does the public service commission retain authority over the rates and terms of any grid-connected service? Is eligibility broad enough to support real projects without becoming a way to escape ordinary utility regulation?

Policies that answer those questions clearly are more likely to attract investment, protect ratepayers, and strengthen reliability at the same time.

Who regulates your power?

Meet the LPSC. Five districts. Five elected commissioners.

Louisiana's five PSC districts

Each district elects one commissioner. Districts 1 and 5 are the two seats on the November 3, 2026 general-election ballot.

November 03 2026
General election

Districts 1 and 5 are on the November 3, 2026 ballot.

1

District 1

General-election candidates
  • Connie Norris Democrat
  • Stephanie Hilferty Republican
  • Christopher “Chris” Justin No Party
5

District 5

General-election candidates
  • James Edward Green Democrat
  • John E. Atkins Republican

Current commissioners: Louisiana Public Service Commission. General-election candidates verified September 22, 2026 through the Louisiana Secretary of State Candidate Inquiry.